RTA Unveils New Bridge to Enhance Traffic Flow in Dubai
📋 Key Takeaway: Dubai’s Roads and Transport Authority has opened a new 500-metre bridge to enhance traffic flow and connectivity in the World Trade Centre area.
New Bridge Enhances Connectivity and Traffic Flow
Dubai’s Roads and Transport Authority (RTA) has officially opened a new 500-metre bridge as part of the World Trade Centre Roundabout Development Project. This initiative aims to improve road infrastructure and traffic efficiency in the emirate, particularly for outbound traffic from Al Bada’ towards 2nd December Street. The bridge provides critical access to Sheikh Rashid Road and Al Mustaqbal Street, addressing the growing demands of the area.
The strategic location of the bridge near Sheikh Zayed Road, one of Dubai’s primary traffic corridors, is expected to enhance connectivity and reduce congestion. This development aligns with the leadership’s vision to make Dubai a premier city for residents and commuters alike.
Project Scope and Traffic Management Improvements
The newly constructed bridge is designed to accommodate up to 1,200 vehicles per hour and significantly reduces travel time from eight minutes to just two minutes for motorists heading towards Sheikh Rashid and Al Mustaqbal Streets. Additionally, the project includes converting the existing signalised intersection on 2nd December Street into a free-flow intersection, further enhancing traffic movement and mobility efficiency in the area.
The World Trade Centre Roundabout Development Project encompasses the construction of six bridges, totaling 5,000 metres in length, to facilitate free-flow traffic in multiple directions. Earlier phases of this project included the opening of a bridge linking Sheikh Zayed Road with Sheikh Khalifa Bin Zayed Street in February 2026, and two additional bridges serving traffic from 2nd December Street towards Sheikh Rashid Road and Al Majlis Street in December 2025.
Future Developments and Traffic Capacity
In addition to the newly opened bridge, the project will see the construction of two more bridges featuring two lanes in each direction, connecting Al Majlis Street and Sheikh Rashid Road with 2nd December Street. These bridges will also have an estimated capacity of around 6,000 vehicles per hour, contributing significantly to the overall traffic management strategy in the area.
The comprehensive approach of the RTA in transforming the World Trade Centre Roundabout into a signalised at-grade intersection is expected to streamline traffic flow and enhance the overall commuting experience for residents and visitors in Dubai.
Frequently Asked Questions
What is the purpose of the new bridge opened by RTA?
The new bridge aims to enhance traffic flow and connectivity from Al Bada’ to key roads in Dubai.
How much traffic can the new bridge accommodate?
The bridge has a capacity to accommodate up to 1,200 vehicles per hour.
What improvements are included in the World Trade Centre Roundabout Development Project?
The project includes the construction of six bridges, a free-flow intersection, and enhancements to existing roadways.
How does the new bridge affect travel times?
It reduces travel time from eight minutes to two minutes for certain routes.
When was the new bridge officially opened?
The new bridge was officially opened recently as part of the ongoing development project.
